Unilateral Change, BFB Hose Load -COMPLETED |
|
|
5/27/2021 Management implemented the hose load SOP prior to negiotations being completed. 6/2 NOI submitted.
6/17 meeting held. Union thinks there should be a dedicated section in the SOP since the engine has different hose bed configurations then the rest of the fleet. Management is insisting that the current hose loads in the policy will be able to be applied to the new E465. It was agreed that if the hose loads arent the same as the rest of the fleet, then they will notify the Union. CLOSED
|
|
|